No buffing/grinding required to the floor surface prior to application of floor finishes.
Under good drying conditions of 20°C and 65% relative humidity, Ultraflo hemihydrate liquid floor screed laid at 40mm will dry in 40 days.
It will dry at 1mm per day for first 40mm then 1/2mm per day for each mm of additional depth. For example, 50mm screed will dry in 60 days. With the use of underfloor heating, a 50mm Ultraflo hemihydrate liquid floor screed can be force dried in less than a month.